thor_sh

Thorium ElectroNuclear - energy for the 3rd millennium !

                                                                                      

Compact

undergroundsitejpg

1GWe MSR plant layout

50m x 50m = 2500 m2 = 0.6 acre that can be located 30m underground, not even occupying valuable urban real estate.

 

Vs 1GWe wind

200 plants à 25 generators towering 50m above ground would occupy 25 000 acres of real estate. Add the bass tone noise of tumbling blades, the broken landscape and the risk of hurricane destruction.

 

Vs biomass

Bio land estimates differ widely. People refer to different performance metrics and different cultivations To fuel Sweden's carpark via ethanol refined from the traditional paper mass would take ten times her current agriculture. Biomass energy density is microscopic compared to fossile fuels. Which in turn are microscopic compared to nuclear.

 

Vs 1GWe solar panels

100 watt per m2 corresponds to 25 000 acres per GWe. Solar is only relevant in the desert tropics. Surface maintenance methods and down times remain unknown.

 

Vs 1GWe Light Water Reactor

An LWR plant takes 250 acres of high security zone and restrictions in a wider periphery.

LWR core vessels weighs hundreds of tons. MSR parts can be loaded in standard containers.

MSRs run at atmospheric pressures. Pipe, pump and vessel dimensioning can accept microcracks and are hence available from a number of competitive manufacturers.    

 

fujiplant                    Kazuo Furukawa's FUJI                                     

                                                             

 

 

 

 

© Thorium ElectroNuclear Ltd | Svarvargatan 5, 11249 Stockholm, SWEDEN | http://www.torium.se | 18 Nov 2010 | Visitors since Nov 07 :